Project Area

Existing Conditions

existing conditions

Traffic Data Collection

Traffic Data

Traffic Summary

Classification: Local
Speed Limit: 25 mph
Average Daily Traffic (ADT): 2,718 VPD (Vehicles per day)
85th % speed: 38 mph
Overall % speeding: 94%

Planned Improvements

  • A series of speed humps throughout corridor