Project Area

project area

Existing Conditions

existing conditions

Traffic Data Collection

Traffic Data

Traffic Summary

Classification: Collector
Speed Limit: 25 mph
Average Daily Traffic (ADT): 1,904 VPD (Vehicles per day)
85th % speed: 36 mph
Overall % speeding: 92%

Planned Improvements

  • A series of speed tables throughout the corridor
  • Pedestrian crossing improvements McClure Ave and Benton

Construction Timeline

Late Spring 2025 construction is anticipated. This project page will be updated once a date is finalized.