Project Area
Traffic Data Collection
Traffic Summary
- Classification: Local
- Speed Limit: 25 MPH
- Average Daily Traffic (ADT): 1,018 VPD (Vehicles per day)
- 85th % speed: 33 MPH
- Overall % speeding: 65%
Planned Improvements
- Adding a series of speed humps throughout this corridor.
Construction Timeline
Construction for this project is scheduled to begin this Wednesday, October 22 and is expected to last two (2) days, weather permitting. Permanent signage will be installed in advance of construction, with asphalt work to take place on both Thursday and Friday. Permanent pavement markings will be installed in the days to follow.
There will be intermittent closures of Bryn Mawr Road between Milwaukee St and Iowa St during asphalt construction. Through traffic should seek alternate routes, but flaggers will be stationed to allow local traffic passage. Small travel delays are likely and should be anticipated.