Project Area

Existing Conditions

Traffic Data Collection

Traffic Summary
Classification: Collector
Speed Limit: 25 mph
Average Daily Traffic (ADT): 5,831 VPD (vehicles per day)
85th percentile speed: 30 mph
Overall % speeding: 48%
Planned Improvements
- Additional two (2) speed humps between McArdle and Bertha
- Three (3) speed tables between Bigham Street and Oneida
- One (1) raised crosswalk near the intersection of Grandview and Sweetbriar
Construction Timeline
Construction was completed on September 5th.