Project Selection

This project was chosen based on the crash history (6 crashes in 5 years), speeds (97% of vehicles speeding), and pedestrian generators (Steel City Squash, Costa Courts).

Project Area

Existing Conditions

existing conditions

Traffic Data Collection

traffic data

Traffic Summary

  • Classification: Collector
  • Speed Limit: 25 MPH
  • Average Daily Traffic (ADT): 4841 VPD (Vehicles per day)
  • 85th % speed: 42 MPH
  • Overall % speeding: 99%

Planned Improvements

  • Installation of three (3) speed tables between Winslow and Orphan
  • Removal of multi-way stop control and stop controled side streets (Shetland, Orphan, and Hooker)
  • Improved pavement markings include stop bars and hi-visibility crosswalks
  • Clarification of one-way signage on Shetland Street
  • Potential bus stop consolidation (Larimer and Shetland only)

Construction Timeline

Construction is expected to begin this Wednesday, August 8th & to last a single day.

A single lane closure of Larimer Avenue will be required during asphalt construction on Wednesday, August 8th. Small travel delays are likely and should be anticipated. Flaggers will be stationed throughout to direct traffic.

Pavement markings will be placed a day or two after asphalt work. Permanent signage will be installed in advance of construction.