Project Selection

This project was chosen based on the crash history (7 crashes in 5 years), speeds (75% of vehicles speeding), and pedestrian generators (PRT and school bus stop location).

Project Area

Existing Conditions

existing conditions

Traffic Data Collection

traffic data

Traffic Summary

  • Classification: Collector
  • Speed Limit: 25 MPH
  • Average Daily Traffic (ADT): 5776 VPD (Vehicles per day)
  • 85th % speed: 33 MPH
  • Overall % speeding: 74%

Planned Improvements

Crosswalk improvements including:

  • Curb extensions
  • Pedestrian safety island
  • Accompanying flex posts

Construction Timeline

This project was selected and designed in 2025, however, due to utility coordination and crew availability, construction has been pushed to Spring 2026. This page will be updated with a construction date once known.