Project Area

project area

Existing Conditions

existing conditions

Traffic Data Collection

Traffic Data

Traffic Summary

Classification: Local
Speed Limit: 25 mph
Average Daily Traffic (ADT): 1,442 VPD (Vehicles per day)
85th % speed: 32 mph
Overall % speeding: 61%

Planned Improvements

  • A series of speed humps throughout the corridor

Construction Timeline

Late Summer/Early Fall 2024 construction is anticipated. This project page will be updated once a date is finalized.