Project Area

Hazelwood project area

Existing Conditions

Hazelwood Ave existing conditions

Traffic Data Collection

Hazelwood Ave traffic data

Traffic Summary

  • Roadway Classification: Collector
  • Speed Limit: 25 mph
  • Average Daily Traffic (ADT): 4,852 vehicles per day (VPD)
  • 85th % speed: 40 mph
  • Overall % speeding: 42%

Planned Improvements

  • Four (4) speed tables will be installed at targeted locations for spot improvements

Construction Timeline

Construction began Wednesday, June 5, 2024 and was expected to last through June 6, 2024. Pavement markings on the speed tables will be placed in the days after actual construction. Signage, however, will be installed in advance of construction.