Rectenwald Sidewalk Project
The sidewalk from McManus to the entrance of Arlington Elementary will be reconstructed. A full height curb will be added
Previous Condition
Final Condition
Image 1 of 4

Sidewalk
A 6 ft wide sidewalk constructed in front of Arlington Elementary School.

Safety Improvements
A full-height curb and space for a street tree were placed a the top of the steps in the direct line of traffic driving down McManus St.

Full Height Curb
A full height curb was constructed to prevent vehicles from parking on the sidewalk and obstructing pedestrian travel.

Street Space Improvement
Rectenwald Street was widened to improve access for busses and families driving students to school