Thornton St. Sidewalk Placement

The intent of this project is to provide a safe pedestrian connection along Thornton Street. Sidewalk, curb, and ADA ramps will be reconstructed to provide accessible connections within these communities. A sidewalk will be constructed on the South side of Thornton St. between Ashlyn St. and Surban St. to provide pedestrian access to Sheraden Park and the steps leading to Sherwood Ave.

A sidewalk will be constructed along Thorton Avenue between Ashlyn and Surban Street.

A sidewalk will be constructed along Thorton Avenue between Ashlyn and Surban Street.